SHARE
+44 (0) 1865 952700 | contact@auroraer.com
Press enquiries
  • This field is for validation purposes and should be left unchanged.

Insight

Home/Financing flexible energy assets: what are the key risks and how can they be managed?

Financing flexible energy assets: what are the key risks and how can they be managed?

This report looks at the various downside risks for flexible assets and explores how these risks can be managed. It also provides the preliminary H2 market outlook and key recent policy and market developments in the flexibility space.

Key takeaways from the analysis include:

  1. The short term outlook for batteries is positive, with new services emerging as potentially valuable revenue streams; Dynamic Containment participants have seen revenues of £17/MW/h, though these are not likely to persist. Signs of optimism are emerging for peakers through periods of low system margins
  2. Relative to our previous update, Aurora’s H2 2020 forecast sees a decrease in wholesale prices of £2.7/MWh (or -4%) from 2023 due to the removal of BSUoS from generators. The same change also leads to an overall reduction of 0.4 GW of gas recips and 0.8 GW of batteries by 2030
  3. Understanding merchant risks becomes increasingly important as the availability of longer-term contracts is likely to continue to diminish for flexible assets. Considering a combination of plausible downsides, Aurora’s P90 for batteries and gas recips see a reduction in IRRs of ~4-5% relative to our Central case
  4. Offtake agreements have become an emerging risk mitigation option for flexible asset developers. Though revenue floors are currently typically low or costly to obtain, developers can limit downside risk exposure while increasing bankability through an offtake agreement

This is subscriber-only content. To enquire about subscribing to our GB Flexible Energy service, please get in touch!

View Report

Our subscription services

Our subscription service provides you with long-term market forecasts, strategic insight reports, interactive client forums and access to our market data and analytics platform.

Interested? Please sign up to receive our complimentary monthly summary reports via email. Simply tick which reports you would like to receive. Please indicate your consent in the box provided and view our privacy policy.

If you would like further information on a particular subscription service or report please enter further information in the box provided.

 

 

  • Please find our privacy policy here

  • The September release of Aurora's monthly FFR report represents a significant update to previous iterations. Changes include a new explanatory introduction section, new analysis focused on the monthly tender of interest, and highlights from the weekly auction trial.

    Read More
  • In the August tender for delivery in September, there were 96 dynamic bids accepted, with a volume-weighted average price of £6.03/MW/h, down 8% from the previous month, continuing the gradual downward trend seen in average prices over the past few months.

    Read More
  • In the July tender for delivery in August, there were 72 dynamic bids accepted, with a volume-weighted average price of £6.59/MW/h, down 5% from the previous month.

    Read More